Get Adobe Flash player
Ghana
Picture6 [4423803].jpg
Architectural drawing of Volta Bible College
http://worldbibleinstitute.com/images/Ghana/01/Picture6 [4423803].jpg
First students for Volta Bible College
http://worldbibleinstitute.com/images/Ghana/01/degree students [4423801].jpg
Block making machine built by Ben Fulks
http://worldbibleinstitute.com/images/Ghana/01/Block press [4423800].jpg
Meeting with the Tribal Chief [4423802].jpg
Clyde Siebman, David Roseberry and David Hamrick meeting with a village chief in the Volta Regio
http://worldbibleinstitute.com/images/Ghana/01/Meeting with the Tribal Chief [4423802].jpg
VBC 1st floor [4423804].jpg
First floor construction of VBC
http://worldbibleinstitute.com/images/Ghana/01/VBC 1st floor [4423804].jpg
IMG_6609.JPG
Second floor going up
q6.jpg
Roof going on first building at VBC
IMG_6613.JPG
Place of worship at new VBC facility
IMG_6616.JPG
Gregg Knight surveys new beds in dormitory
IMG_6631.JPG
Farm project making great progress with addition of tractor
IMG_6727.JPG
One of our graduates with his poultry farm to be self supported
IMG_6678.JPG
Jonathan Crowell with some of the VBC Staff